本项目总投资100000万元,用地面积278亩,将建设年产10万吨锂离子电池负极材料生产基地,包含预精细磨粉、预碳化、一体化坩埚线、硅碳前驱体线、硅碳成品线,并建设硅基负极材料研究院、钠电负极材料研究院各一所。
Chongging Jinhuineng New Project of Annual Production of 100,000-Ton Negative Materials
With a total investment of RiB 100,000 milion yuan and a site area of 278 mu, the project involves the constructionof a production base that tums out 100,000 tons of lithium-ion battery negative materials annually, including pre-finepulverization, pre-carbonization, integrated crucible line, siicon-carbon precursor ine, and silicon-carbon finishedproduct line, as well as the construction of a silicon-based negative material research institute and a sodium-ion
battery negative material research institute.